§ 47-73. Individual calculation of road impact fees.  


Latest version.
  • (a)

    In the event a road impact construction involves a land use not contemplated under the road impact fee land use categories set forth in section 47-69, the county coordinator shall determine the number of new net vehicle-miles of travel to be generated by the proposed road impact construction and shall calculate the appropriate road impact fee, utilizing the methodology contained in the road impact fee study adopted by section 47-68. The county coordinator shall utilize as a standard in this determination the vehicle-miles of travel generation rates in the most similar land use category or any other generally accepted standard source of transportation engineering or planning.

    (b)

    In the event a road impact construction involves a mixed use road impact construction, the county coordinator shall calculate the road impact fee based upon the number of new net vehicle-miles of travel to be generated by each separate road impact fee land use category included in the proposed mixed use road impact construction.

(Ord. No. 05-08, § 4.08, 11-17-2005; Ord. No. 2016-01 , Art. 12, 2-16-2016)